In a remarkable feat of construction, a 9000m2 suspended floor was efficiently built within an impressive timeframe. This accomplishment was made possible through the implementation of an innovative solution, featuring the utilization of freestanding precast columns equipped with Peikko column shoes, complemented by Piekko Deltabeams and hollowcore planks.
Notably, this solution eliminated the need for any supporting props or braces, resulting in a suspended floor that was not only constructed faster but also ensured enhanced safety compared to traditional construction methods.